The pipe work
is then installed vertically with an outlet on each floor
until the top floor where an air release valve is fitted.
The inlet valve and outlet valve cabinets and valves are then
fitted.
When the installation is finished, the dry Riser can then
be commissioned where the whole system is tested with a full
wet test to 10 bar in accordance with British Standards
9990/2006 once this has been carried out and everything
is working properly a certificate is issued.
|